A front half part and a
back half part are originally
another buildings, although
it connected, and the
4 stories factory of
our company had become
the structure which
weight cloth etc.
can roll round freely
from the first floor to the
fourth floor,
using the crevice.
Those days, the weight machine etc.
focused on the front portion and
the front first floor portion collapsed. |
 |
 |
 |
a heavy industrial machine be surely
needed ,and although the revival work
by the crane be began from 2nd after
an earthquake ,by support of a fire
department ,a municipal office , etc. ,
abbreviation days [ 10 days ] after ,
it be able to be led to a police car
from Osaka ,and had you able to
come to a heavy industrial
machine , a portion be able to be
disassembled
in the first half for the time being ,
and a visitor completion product be able
to be take out a product and shipped
the place a place be puzzled .
However since it disassembled in a hurry
in order that a heavy industrial machine
may go to restore of a Hanshin highway
3 days after,the machines of our company
were hardly able to be taken out in safety. |
 |
 |
President who does restoration
directions |
 |
|